A capital equipment manufacturer
Two suppliers had failed on the same feature.
A thin-walled component was distorting during machining. Two previous suppliers had scrapped a high proportion of parts and neither could explain why.
We changed the fixturing and the sequence so the wall was finished last with the part fully supported, and added an in-process check at the point the distortion had been occurring.
Consistent conformance and a scrap rate that made the part economic again.
Results
How we work
Four stages, and you will always know which one you are in.
01
Send drawings or a sample. Quotation within two working days, with a note on cost drivers.
02
A first article with full inspection report, signed off by you before production runs.
03
Scheduled manufacture with in-process inspection and traceability through every batch.
04
Delivery to schedule, held stock where agreed, and a quarterly supply review.
Quotations usually come back within two working days, with a note on anything in the design that will cost you more than it needs to.
Request a quote