A vehicle systems manufacturer
A material shortage that stopped several of their other suppliers.
A sudden material shortage across the sector threatened to stop the customer’s line within weeks.
The buffer stock in our supply agreement covered the gap, and we qualified an alternative material with the customer’s engineers in parallel.
The customer’s line never stopped.
Results
How we work
Four stages, and you will always know which one you are in.
01
Send drawings or a sample. Quotation within two working days, with a note on cost drivers.
02
A first article with full inspection report, signed off by you before production runs.
03
Scheduled manufacture with in-process inspection and traceability through every batch.
04
Delivery to schedule, held stock where agreed, and a quarterly supply review.
Quotations usually come back within two working days, with a note on anything in the design that will cost you more than it needs to.